How do you prepare for systematic condition inspection (STK) in Norway?
Before booking systematic condition inspection (systematisk tilstandskontroll, or STK), assemble a clear picture of the installation, the evidence available and the questions still open. The aim is to give the inspection body enough information to define the work and plan a useful visit.
From 1 January 2027, amended Section 9 sets STK at least every five years, with frequency and scope adapted to operating conditions. Categories a–j require an accredited inspection body under the corrected provision in FOR-2026-02-20-244. The guide to five-year STK intervals and RBI explains the conditions for longer intervals.
For an overview of the regulatory amendments, see Norway’s hazardous substance inspection rule changes from 2027.
This is a practical preparation guide, not a universal statutory document list. If the assessment itself is unfamiliar, start with what systematic condition inspection (STK) involves.
First identify the regulatory route
For applicability, establish the installation’s function, substances and hazard classifications, relevant quantities, pressure and temperature, and Section 17 consent status where applicable. State whether the equipment is new, in service or affected by a modification. The affected-facilities guide explains how these facts relate to the categories.
For the broader relationship between regulatory applicability, accreditation and inspection intervals, refer to Norway’s hazardous substance inspection requirements.
Inspection planning then needs a more detailed picture: equipment identifiers, drawings, previous findings, changes and available access. Keep uncertainties about legal applicability visible alongside gaps in technical records.
For new or modified installations, the comparison of installation inspection and STK explains the difference between inspection before operation and condition assessment during service.
Minimum readiness pack
Send the following if available. Mark missing or uncertain information rather than guessing.
- Installation description, location, system boundaries and responsible owner/user.
- Equipment list with tags or other consistent identifiers.
- Substances handled and current classification information.
- Relevant capacity or volume, operating pressure and temperature.
- Previous inspection reports, dates, scope and limitations.
- Repairs, modifications and changes in operating conditions.
- Open findings, assigned actions and available closure evidence.
- Section 17 consent information and any relevant RBI programme.
- Available drawings and technical records, with known documentation gaps.
- Requested timing, access or shutdown constraints, and a technical contact.
Make the boundary traceable
Use the same identifiers in the equipment list, drawings and reports. Explain shared equipment and interfaces, including connecting pipework or common safety systems. Where responsibilities are split, identify who supplies records, arranges access and follows up findings.
A missing tag or an outdated drawing is an issue to resolve. Identify the affected item and uncertainty so the inspection body can consider verification needs when scoping the work.
Bring the history behind the latest report
A report title and date do not prove that the whole current installation was inspected. Check the equipment covered, inaccessible areas, exclusions and unresolved findings. Include relevant earlier reports where they explain deterioration or outstanding work.
Show what changed after the last inspection, including alterations to service, substances, pressure, temperature or equipment configuration. Relevant NDT and testing records can support the assessment, with the methods and areas examined identifiable.
Keep each open finding connected to an action, responsible person and evidence of completion. Issuing a repair order does not establish that the finding is closed; retain the completion and verification records where applicable.
Agree the scope and report before mobilisation
Check the provider’s current accreditation scope against the actual assignment. The guide to verifying an accredited inspection body in Norway explains the supplier checks without relying on a certificate heading alone.
Agree the equipment boundary, inspection criteria, available evidence, expected report and any limitations or exclusions. Clarify how findings and areas that could not be assessed will be documented. Where engineering work is also needed, define its deliverable separately from the inspection.
Plan access through site procedures
Discuss access restrictions and operational constraints early. Any shutdown, isolation, opening of equipment or specialist access must follow the site’s controlled planning and safety procedures. This checklist is not an instruction to open equipment or change operating conditions.
Distinguish the requested visit date from an established inspection deadline. Allow the team to consider preparation, assessment and necessary follow-up when arranging the work.
Start with the information you have
A complete dossier is not needed for an initial enquiry. Send the installation summary, available records, preferred timing and a clear list of gaps through NWE’s in-service inspection enquiry.
Nord Welding & Engineering (NWE) AS can review the proposed work against its current INSP 073 scope and identify further information needed. Name a technical contact who can resolve scope questions; missing records can then be discussed explicitly rather than hidden behind assumptions.