As a Recognized Third-Party Organization (RTPO) under PED 2014/68/EU, NWE provides impartial verification and approval of permanent joints (e.g., welding, brazing) on pressure equipment to the Essential Safety Requirements of Annex I. Our inspectors witness WPS/PQR qualification, verify welder/brazer qualifications (WPQ/BQ), oversee production test plates and NDT acceptance, and check materials traceability, heat treatment (PWHT) and documentation. This independent oversight reduces non-conformities, de-risks the manufacturer’s conformity assessment, and strengthens the technical file for notified-body review. All activities are performed by an ISO/IEC 17020–accredited inspection body to ensure competence, consistency, and full PED compliance.
NWE is accredited by Norwegian Accreditation in accordance with ISO/IEC 17020 for Permanent Joining Procedure Approval under PED 2014/68/EU, Annex I, Section 3.1.2 (RTPO).

If your inquiries haven’t been fully addressed, feel free to Advise with NWE’s specialists
We’re excited to connect with you and share more about how we can collaborate together!
Direct contact
For general enquiries, use the details below or send your requirement through the contact form.
contact@nwegroup.no
+47 402 211 00
+97-150 952 4442
Send an enquiry
Share the project details available at this stage. Our team will review your request and follow up if additional technical information is needed.
NWE provides independent third-party inspection services and separate asset-integrity engineering support—improving quality and safety, protecting operations and budgets, and enhancing environmental performance.