An accreditation certificate is a starting point for choosing an inspection body. The decision depends on the legal entity, the inspection activity and the published scope that connects the two. A supplier may offer testing, engineering and inspection, while only specified activities fall under its inspection-body accreditation.
For owners of hazardous-substance installations, a useful proposal identifies which work will be accredited and the basis for that claim. This becomes especially relevant as Norway’s amended Section 9 requirements take effect on 1 January 2027.
What accreditation establishes
Accreditation under ISO/IEC 17020 recognises an inspection body’s competence for specified activities, with requirements covering impartiality and consistent operation. Other credentials answer different questions:
- A management-system certificate, such as ISO 9001, concerns the certified management system.
- An individual NDT qualification concerns the person’s competence within its stated limits.
- A PED Notified Body designation concerns authorised conformity-assessment tasks under the Pressure Equipment Directive.
None of these credentials, by itself, establishes inspection-body accreditation for the national Section 9 assignment. Where a supplier holds several recognitions, ask which one applies to the deliverable being purchased.
What Section 9 requires from 2027
FOR-2026-02-04-140 amends the existing hazardous-substances regulation. For categories a–j, installation inspection must be performed by an accredited inspection body before operation. The same categories require accredited systematic condition inspection, or systematisk tilstandskontroll (STK), during service.
The adopted definition expressly names NS-EN ISO/IEC 17020:2012, Type A, B or C. FOR-2026-02-20-244 corrects the STK provision’s cross-reference to that definition in the third paragraph.
Start by identifying which facilities are covered, then match the provider to the required activity. The comparison of installation inspection and STK explains how the inspection purpose changes across the lifecycle.
Types A, B and C in the referenced 2012 edition
These types describe independence arrangements, not quality grades. The following summary concerns the 2012 framework named in Section 9.
| Type | Independence arrangement | Implication for the buyer |
|---|---|---|
| A | Independent third-party inspection, subject to the prescribed separation from activities involving the inspected items. | Check the actual scope as well as independence. |
| B | An identifiable inspection function serving only its parent organisation. | It is not a general external supplier. |
| C | An inspection function that may serve its own organisation and external clients, with required safeguards separating inspection from other activities. | Check the safeguards and requirements for the assignment. |
Section 9 accepts all three under its stated 2012 reference. Their different organisational arrangements still affect which body can undertake a particular assignment.
Standards status and transition (October 2026)
ISO published ISO/IEC 17020:2026 on 27 March 2026 and lists the 2012 edition as withdrawn. The new edition uses two independence categories: Type A and Type non-A.
Norwegian Accreditation’s transition notice sets out a three-year period from publication, with transition assessments alongside ordinary visits. It has also published 2026 conformity matrices and application/scope forms. The notice labels its application timetable tentative.
The international standard’s publication status and the edition expressly named in Norwegian legislation are distinct facts. The adopted Section 9 still names 2012 and A/B/C. Withdrawal of the ISO edition does not, by itself, establish that a body’s accreditation has ended. Check the current accreditation record and applicable transition position when appointing a provider.
Read the scope, not only the certificate
Match the published scope
Look for the installation field, inspection activity, new or in-use coverage, and normative documents. Match these to the proposed boundary and the entity issuing the report. A broad service description such as “pressure equipment inspection” may leave several of those questions unanswered.
Separate supporting services and accredited outputs
Retain the relevant scope reference with the proposal. Where testing or engineering is included in the same order, identify those outputs separately so the accredited inspection conclusion is clear.
Five questions before appointment
- Which legal entity will accept the assignment and issue the report?
- Which current scope entry covers this installation and activity?
- What information is needed to define the equipment and system boundary?
- What limitations, exclusions or supporting-party arrangements apply?
- What will the report assess, and how will findings be recorded?
Checking an NWE proposal
Norwegian Accreditation currently lists Nord Welding & Engineering (NWE) AS under INSP 073 as Type A against NS-EN ISO/IEC 17020:2012. Its entries cover new and in-use pipelines, process facilities and specified tank installations within the listed normative scope.
Ask the proposal to identify the entry that covers your installation and the inspection stage. The selection is ready to proceed when the legal entity, current scope and promised report describe the same assignment.