Systematic condition inspection, or systematisk tilstandskontroll (STK), is a planned, comprehensive safety-oriented assessment of an installation’s condition during operating life. It comes in addition to ordinary maintenance. For equipment and installations handling hazardous substances, it should support decisions about continued safe operation, necessary actions and the basis and timing for the next inspection.
The practical question is straightforward: what evidence supports continued operation, and what must be corrected, investigated or monitored? A useful inspection connects physical findings with operating history, documentation and the particular hazards of the installation.
STK and other activities
| STK involves | This is not automatically STK |
|---|---|
| An assessment of condition and relevant safety functions | Routine servicing or component replacement |
| Methods selected to answer defined condition questions | Thickness readings or a stand-alone NDT report |
| Evaluation of findings, limitations and operating context | A generic site visit or engineering study alone |
Where STK fits in Section 9
The general STK duty already exists. FOR-2026-02-04-140, subsequently amended by FOR-2026-02-20-244, changes important Section 9 requirements from 1 January 2027. For the listed a–j categories, installation inspection before operation and STK in service must be performed by an accredited inspection body. Installation inspection, often called ferdigkontroll in existing guidance, does not replace later STK.
The general inspection duty and the category-specific accreditation requirement remain separate. Equipment outside a–j is not automatically exempt from condition inspection. Use the affected-facilities guide to determine whether the accredited-body requirement applies.
Inspection intervals
From 2027, STK must be performed at least every five years, with frequency and scope adapted to operating conditions. Shorter intervals may be required. Intervals beyond five years require equipment or installations in a Section 17 consent-required undertaking and inspections under an RBI programme following a recognised norm. The guide to five-year intervals and RBI explains this exception.
What makes the assessment systematic
Define the assessment boundary
Start with a defined boundary. Identify the equipment, connected systems, substances and operating conditions covered by the assessment. Relevant history includes earlier findings, repairs, modifications and significant operating events. State gaps in the available evidence rather than assuming an earlier report describes today’s configuration.
Select condition-assessment methods
The methods need to answer the relevant deterioration and safety questions. Visual examination, measurements and other non-destructive testing provide evidence that the inspector evaluates against the installation’s condition and operating context.
From measurements to an assessment
A thickness reading describes the measured location; it does not automatically establish the condition of the whole installation. An NDT report can be valuable input to STK, but the broader assessment also considers scope, limitations and the significance of the findings. Where essential areas are inaccessible, the report should identify what remains unresolved and how this affects its conclusions.
Consider a maintenance record showing that a valve was replaced. That record explains the repair. STK considers its significance for the assessed system, including relevant functions, other condition findings and the evidence supporting continued operation.
Competence and accreditation
The assessment requires knowledge and experience of the installation, suitable methods and interpretation of the findings. For categories a–j, it must be delivered by an inspection body with an accredited scope covering the assignment. The guide to accredited inspection bodies explains how competence, independence and scope fit together.
What an STK report should establish
DSB’s guidance for process installations describes reporting on what was inspected, the methods and results, the assessment of findings, actions and their timing, and the recommended next inspection. Building on that guidance, a useful report should establish:
- The installation and equipment inspected, boundaries and assessment basis.
- Methods used and the results or findings they produced.
- Limitations, inaccessible areas and unresolved information gaps.
- The assessment and conclusions about condition within that scope.
- Required or recommended actions, their timing, and the basis and timing for the next inspection as applicable.
The level of detail and assessment basis should reflect the installation and the applicable normative requirements.
Use the findings in operating decisions
Use the conclusions to assign necessary actions and retain a record of their completion. Resolve significant evidence gaps and consider whether equipment or operating changes affect the assessment. A future inspection date does not justify postponing action on a known safety problem.
Planning STK for an operating installation
NWE’s in-service inspection service is a starting point for discussing the assessment of operating assets. NWE is registered as a Type A inspection body under INSP 073; the proposed work must fall within its current accredited scope. An installation description, substance information, previous report and known changes help define the inspection need.
The value of STK lies in what the owner can do with its conclusions: address deterioration, resolve uncertainty and plan the next assessment on a documented basis. The inspection-readiness guide explains how to prepare the evidence and site arrangements for that work.